The NU construction site says it will be done in Nov 2019 https://www.northwestern.edu/fm/campus/maps/docs/190404-monthly-construction-update.pdf
heard optimistically sep 2019. conservatively early 2020. most likley dec 2019
Just need the hole in the ground to put all the bodies in of guys that did not get it doneMaybe they need a different foreman to get this thing delivered by the start of fall practice...
![]()
That explains the change from the article I saw a while back about starting access in June. 4-6 months would put it late 2019i believe something was added to the scope of the project that they didn't foresee until they had things opened up. tacked on 4-6 months of work. if you ever had the pleasure of renovating a home you know this all too well!
Probably a sliding board a la Clemson football....i believe something was added to the scope of the project that they didn't foresee until they had things opened up. tacked on 4-6 months of work. if you ever had the pleasure of renovating a home you know this all too well!
Wildcat Report
Ten Questions: 10. How many games will the Cats win this season?
Wildcat Report
Notebook: Braun readies Northwestern for 'test' of FCS power South Dakota State
Edgy Tim
2029 DL Pohlman is one to watch
Wildcat Report
Recruit Roundup: Norman rushes for 262 yards and four TDs in rivalry win
Wildcat Report
Scouting Report: Johnson and Wallace leave it all on the field in narrow 36-35 loss to St. Rita