..there hasn't been one selected. The Mize Pavilion went through a selected bidders process so I assume the football facility will too.

That's why I'm skeptical that construction will begin next month. Perhaps some earthwork will start, but construction... no way.
 

formerdog

Redshirt
Jul 29, 2009
38
0
0
where construction will take part in pieces with individual parts being done step by step. The architecture firm has likely finished the grading design and they have already selected someone to do that. I work in an architectural firm and most of the work we do is "piece-mealed" out to where we can be assured that the best work in each area is done seperately.
 
Maroon and White

Latest

  1. 01 Maroon and White Football "Everybody wants the same thing": Mississippi State's Magee and Prudhomme speak on offense changing gears through open week
  2. 02 Maroon and White Mississippi State G Josh Hubbard selected Preseason All-SEC First Team
  3. 03 Maroon and White Football Points of Focus: Mississippi State HC Jeff Lebby speaks on Week 7 "Reset"
  4. 04 Maroon and White Football Everything Mississippi State HC Jeff Lebby said in Monday presser
  5. 05 Maroon and White Basketball Mississippi State MBK G Cameren Paul shares re-injury news on social media