<p class="MsoNormal"><span style="font-size: 10pt; font-family: "Verdana","sans-serif"; color: black;">Ole Miss bud sent me this...</span></p><p class="MsoNormal">
</p><p class="MsoNormal"><span style="font-size: 10pt; font-family: "Verdana","sans-serif"; color: black;"></span></p>
</span></p>
<p class="MsoNormal"><span style="font-size: 10pt; font-family: "Verdana","sans-serif"; color: black;"></span></p>
<p class="MsoNormal"><span style="font-size: 10pt; font-family: "Verdana","sans-serif"; color: black;">
</span></p>
</p><p class="MsoNormal"><span style="font-size: 10pt; font-family: "Verdana","sans-serif"; color: black;"></span></p>
<span style="font-size: 10pt; font-family: "Verdana","sans-serif"; color: black;"></span><p class="MsoNormal"><span style="font-size: 10pt; font-family: "Verdana","sans-serif"; color: black;">According to multiple sources, Ole Miss officials have moved
forward on plans to build a replacement arena for basketball. The project,
according to sources, would likely cost in the range of $85-90 million. The
project would be financed via federal bonds, state bonds, corporate naming
rights and then private donations. The remainder would be financed. The project
would be a multi-use facility that would also house a replacement for the
Turner Center and a small food court. There is some speculation that ground
could be broken in the next 12 months and the building could be built in 18-24
months, depending on the location that is ultimately chosen.
Again, the project is still in the very early stages, and the plans are almost
certainly fluid and subject to change. I'm headed to Atlanta today and will try
to touch base with some Ole Miss officials there about these developments.
</span></p>
<p class="MsoNormal"><span style="font-size: 10pt; font-family: "Verdana","sans-serif"; color: black;"></span></p>
<p class="MsoNormal"><span style="font-size: 10pt; font-family: "Verdana","sans-serif"; color: black;">
</span></p>